Crane service provider Sarilar faced two main challenges when erecting a new building at the premises of the Adana Sugözü coal-fired power plant on behalf of Termokimik: On one hand, the steel ...
It is a myth that steel structures of Goliath gantry (and other) cranes require only a minimum amount of inspection and that steel structures of such cranes do not, in general, suffer from fatigue. IC ...
In the notes for lifting capacities, a well-known crane manufacturer's manual states, "All rated loads have been tested to and meet minimum requirements of SAEJ1063OCT80-Cantilevered Boom Crane ...
The operation to mount the circular bridge crane - a key part of the reactor building that will be used at all stages of the plant's life cycle - took about four hours to complete. A metal structure ...